Start with the reason this software should exist, not your preferred technology. What kind of user will use this, how often, and how is the job done today? An estimator who grasps the purpose can propose a cheaper route to it; one who only sees the requirements as given prices your assumptions along with the work.
Set out the scope as concrete flows: who does what, and what happens next. Equally important, write down what is out of scope. An explicit exclusion list prevents more friction at delivery time than any other single page. Also mark which parts are firm and which are still under discussion — honest teams price those differently, and concealing the open questions helps no one.
Write down the hard constraints. These include existing systems the germany software development agency has to talk to, existing databases and their quality, compliance requirements, best java development company user volumes, which devices matter and any technology you are committed to. If there is a hard date, explain what drives it: a team can often resequence the work to hit it, provided they hear about it early.
Write down what the word done means feature by feature. Testable acceptance criteria do not need special syntax: a short paragraph describing what must be true when the feature works is sufficient. That one addition compresses acceptance testing by a surprising margin and closes off most late-stage disagreement.
One last thing, say what you expect back. Request an itemised estimate, a written list of assumptions, whatever the team considers risky and an optimistic and a pessimistic figure. Take a broad range as useful information rather than evasion: it normally identifies where your description is thin. Then clarify that area and ask again — the revised figure tends to be much more reliable.